Optimal Analysis of Tunnel Construction Methods through Cross Passage from Subway Shaft

The conversion section of the cross passage and shaft is a priority concern in the stress transformation of a tunnel structure during subway underground excavation. In the construction of Subway Line 5 in Xi'an, China, the main line in the loess layer was constructed through the cross passage f...

Full description

Saved in:
Bibliographic Details
Main Authors: Zhanping Song, Zhilin Cao, Junbao Wang, Shoufeng Wei, Shichun Hu, Zelin Niu
Format: Article
Language:English
Published: Wiley 2018-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2018/5181954
Tags: Add Tag
No Tags, Be the first to tag this record!