Study on Structure Review of Emptying Bottom Outletfor Raising Water Retaining Level of Goupitan Arch Dam
During the normal operation of Goupitan Reservoir, the emptying bottom outlet is blockedby the inlet water retaining gate, or by the working gate at the outlet of the bottom outlet ifthe water retaining gate needs to be repaired. The designed water retaining level of the workinggate and gate support...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2020-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.04.012 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|