Transformer Outage Contingency in the Southern Interconnected Grid of Cameroon Based on Dynamic Power Flow Simulation

The power system is a network of components having specific operational limits such that any violation of these limits during their operation could lead to more damage in the grid. The grid in Cameroon has been facing several undesired loading events at some sections of the network and the utility c...

Full description

Saved in:
Bibliographic Details
Main Authors: Chu Donatus Iweh, Wirnkar Basil Nsanyuy, Nde Donatus Nguti, Emmanuel Tanyi
Format: Article
Language:English
Published: Wiley 2024-01-01
Series:Journal of Engineering
Online Access:http://dx.doi.org/10.1155/2024/5394978
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832543422326505472
author Chu Donatus Iweh
Wirnkar Basil Nsanyuy
Nde Donatus Nguti
Emmanuel Tanyi
author_facet Chu Donatus Iweh
Wirnkar Basil Nsanyuy
Nde Donatus Nguti
Emmanuel Tanyi
author_sort Chu Donatus Iweh
collection DOAJ
description The power system is a network of components having specific operational limits such that any violation of these limits during their operation could lead to more damage in the grid. The grid in Cameroon has been facing several undesired loading events at some sections of the network and the utility company has over the years, employed measures to mitigate these issues. This study has used the ETAP software to conduct a contingency analysis on the largest independent grid in Cameroon, supplying 6 regions in Cameroon. Seventeen transformer outage events in the network were used to conduct the N-1 scenario-based contingency, so that the vulnerability of the network can be evaluated. The fast decoupled power flow method was continuously applied on the network, and the different contingency scenarios were ranked using a combination of 4 performance indices. These four performance indices gave information on the impact of the various transformer outage scenarios on the grid. The four indices were added to give a combined value, and the outages were ranked in order of severity based on this combined index. A major contribution of this paper is the use of four scalar indices to classify the critical elements in the grid of a developing country. The initial load flow simulation of the network showed that 12 nodes had under voltages, while 3 transformers and one transmission line were overloaded. The Ngousso corridor suffered one of the worst under voltage situation during the initial power flow study. This is an indication that the utility company needs to undertake intensive network upgrade and implore measures to increase power generation to support the growing loads. It was observed that all the contingency scenarios experienced convergence. The Oyomabang transformer 1 had the highest combined index of 71.20, showing a huge negative impact on the network as a result of the outage of the transformer. This was followed by the Oyomabang transformer 2 with a combined index of 48.63. The results will be very useful to utility operators in prioritizing transformers in the network with high risk of causing huge impact on the network in case of an outage.
format Article
id doaj-art-5d91252b6b9043eba6a8cfa257c93860
institution Kabale University
issn 2314-4912
language English
publishDate 2024-01-01
publisher Wiley
record_format Article
series Journal of Engineering
spelling doaj-art-5d91252b6b9043eba6a8cfa257c938602025-02-03T11:43:46ZengWileyJournal of Engineering2314-49122024-01-01202410.1155/2024/5394978Transformer Outage Contingency in the Southern Interconnected Grid of Cameroon Based on Dynamic Power Flow SimulationChu Donatus Iweh0Wirnkar Basil Nsanyuy1Nde Donatus Nguti2Emmanuel Tanyi3Regional Centre for Energy and Environmental Sustainability (RCEES)Department of Electrical and Electronic Engineering, Faculty of Engineering and TechnologyDepartment of Electrical and Electronic Engineering, Faculty of Engineering and TechnologyDepartment of Electrical and Electronic Engineering, Faculty of Engineering and TechnologyThe power system is a network of components having specific operational limits such that any violation of these limits during their operation could lead to more damage in the grid. The grid in Cameroon has been facing several undesired loading events at some sections of the network and the utility company has over the years, employed measures to mitigate these issues. This study has used the ETAP software to conduct a contingency analysis on the largest independent grid in Cameroon, supplying 6 regions in Cameroon. Seventeen transformer outage events in the network were used to conduct the N-1 scenario-based contingency, so that the vulnerability of the network can be evaluated. The fast decoupled power flow method was continuously applied on the network, and the different contingency scenarios were ranked using a combination of 4 performance indices. These four performance indices gave information on the impact of the various transformer outage scenarios on the grid. The four indices were added to give a combined value, and the outages were ranked in order of severity based on this combined index. A major contribution of this paper is the use of four scalar indices to classify the critical elements in the grid of a developing country. The initial load flow simulation of the network showed that 12 nodes had under voltages, while 3 transformers and one transmission line were overloaded. The Ngousso corridor suffered one of the worst under voltage situation during the initial power flow study. This is an indication that the utility company needs to undertake intensive network upgrade and implore measures to increase power generation to support the growing loads. It was observed that all the contingency scenarios experienced convergence. The Oyomabang transformer 1 had the highest combined index of 71.20, showing a huge negative impact on the network as a result of the outage of the transformer. This was followed by the Oyomabang transformer 2 with a combined index of 48.63. The results will be very useful to utility operators in prioritizing transformers in the network with high risk of causing huge impact on the network in case of an outage.http://dx.doi.org/10.1155/2024/5394978
spellingShingle Chu Donatus Iweh
Wirnkar Basil Nsanyuy
Nde Donatus Nguti
Emmanuel Tanyi
Transformer Outage Contingency in the Southern Interconnected Grid of Cameroon Based on Dynamic Power Flow Simulation
Journal of Engineering
title Transformer Outage Contingency in the Southern Interconnected Grid of Cameroon Based on Dynamic Power Flow Simulation
title_full Transformer Outage Contingency in the Southern Interconnected Grid of Cameroon Based on Dynamic Power Flow Simulation
title_fullStr Transformer Outage Contingency in the Southern Interconnected Grid of Cameroon Based on Dynamic Power Flow Simulation
title_full_unstemmed Transformer Outage Contingency in the Southern Interconnected Grid of Cameroon Based on Dynamic Power Flow Simulation
title_short Transformer Outage Contingency in the Southern Interconnected Grid of Cameroon Based on Dynamic Power Flow Simulation
title_sort transformer outage contingency in the southern interconnected grid of cameroon based on dynamic power flow simulation
url http://dx.doi.org/10.1155/2024/5394978
work_keys_str_mv AT chudonatusiweh transformeroutagecontingencyinthesoutherninterconnectedgridofcameroonbasedondynamicpowerflowsimulation
AT wirnkarbasilnsanyuy transformeroutagecontingencyinthesoutherninterconnectedgridofcameroonbasedondynamicpowerflowsimulation
AT ndedonatusnguti transformeroutagecontingencyinthesoutherninterconnectedgridofcameroonbasedondynamicpowerflowsimulation
AT emmanueltanyi transformeroutagecontingencyinthesoutherninterconnectedgridofcameroonbasedondynamicpowerflowsimulation