Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge
Currently, the bearings of Poyanghu Bridge, a 636-meter long cable-stayed bridge, have been damaged. According to numerical analyses, the mechanical state of the damaged bridge unfavorably deviates from the ideal design state, and the bridge should be repaired in time to restore its safety and servi...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8819360 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832566477346045952 |
---|---|
author | X. X. Cheng F. B. Ma J. Q. Chen B. Dong G. Wu |
author_facet | X. X. Cheng F. B. Ma J. Q. Chen B. Dong G. Wu |
author_sort | X. X. Cheng |
collection | DOAJ |
description | Currently, the bearings of Poyanghu Bridge, a 636-meter long cable-stayed bridge, have been damaged. According to numerical analyses, the mechanical state of the damaged bridge unfavorably deviates from the ideal design state, and the bridge should be repaired in time to restore its safety and serviceability. However, compared with the bearing repair of beam bridges, much less scientific and engineering endeavors have been made in the history to direct the bearing repair of cable-stayed bridges. This article proposes two innovative bearing repair schemes for cable-stayed bridges and reports the numerical validations, the on-location applications, and the monitoring of the proposed repair schemes under the engineering backgxround of Poyanghu Bridge. Through these works, it is found that the proposed repair schemes are effective in practical use. |
format | Article |
id | doaj-art-583b3c03123e47119bc9f14b68b1c93c |
institution | Kabale University |
issn | 1687-8086 1687-8094 |
language | English |
publishDate | 2020-01-01 |
publisher | Wiley |
record_format | Article |
series | Advances in Civil Engineering |
spelling | doaj-art-583b3c03123e47119bc9f14b68b1c93c2025-02-03T01:03:57ZengWileyAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/88193608819360Bearing Repair and Monitoring for Poyanghu Cable-Stayed BridgeX. X. Cheng0F. B. Ma1J. Q. Chen2B. Dong3G. Wu4School of Civil Engineering, Southeast University, Nanjing, ChinaSchool of Civil Engineering, Southeast University, Nanjing, ChinaSchool of Civil Engineering, Southeast University, Nanjing, ChinaSchool of Civil Engineering, Southeast University, Nanjing, ChinaSchool of Civil Engineering, Southeast University, Nanjing, ChinaCurrently, the bearings of Poyanghu Bridge, a 636-meter long cable-stayed bridge, have been damaged. According to numerical analyses, the mechanical state of the damaged bridge unfavorably deviates from the ideal design state, and the bridge should be repaired in time to restore its safety and serviceability. However, compared with the bearing repair of beam bridges, much less scientific and engineering endeavors have been made in the history to direct the bearing repair of cable-stayed bridges. This article proposes two innovative bearing repair schemes for cable-stayed bridges and reports the numerical validations, the on-location applications, and the monitoring of the proposed repair schemes under the engineering backgxround of Poyanghu Bridge. Through these works, it is found that the proposed repair schemes are effective in practical use.http://dx.doi.org/10.1155/2020/8819360 |
spellingShingle | X. X. Cheng F. B. Ma J. Q. Chen B. Dong G. Wu Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge Advances in Civil Engineering |
title | Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge |
title_full | Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge |
title_fullStr | Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge |
title_full_unstemmed | Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge |
title_short | Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge |
title_sort | bearing repair and monitoring for poyanghu cable stayed bridge |
url | http://dx.doi.org/10.1155/2020/8819360 |
work_keys_str_mv | AT xxcheng bearingrepairandmonitoringforpoyanghucablestayedbridge AT fbma bearingrepairandmonitoringforpoyanghucablestayedbridge AT jqchen bearingrepairandmonitoringforpoyanghucablestayedbridge AT bdong bearingrepairandmonitoringforpoyanghucablestayedbridge AT gwu bearingrepairandmonitoringforpoyanghucablestayedbridge |