Paste Pipeline Transportation of Pumping Backfill Technology with Long Distance and High Stowing Gradient in Cold and High-Altitude Areas

A paste pipeline transportation of pumping backfill technology with long distance and high stowing gradient is proposed to solve the problem of filling slurry transportation with low concentration, the filling body poor quality, and the transportation difficulties with long distance and high stowing...

Full description

Saved in:
Bibliographic Details
Main Authors: Wei-jun Liu, Min Chen, Fei-fei Wang, Ren-ze Ou, Qi Liu
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/5287023
Tags: Add Tag
No Tags, Be the first to tag this record!