Social Risk Early Warning of Environmental Damage of Large-Scale Construction Projects in China Based on Network Governance and LSTM Model
With the improvement of citizens’ risk perception ability and environmental protection awareness, social conflicts caused by environmental problems in large-scale construction projects are becoming more and more frequent. Traditional social risk prevention management has some defects in obtaining ri...
Saved in:
Main Authors: | Junmin Fang, Dechun Huang, Jingrong Xu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2020/8863997 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Stakeholder Conflict Amplification of Large-Scale Engineering Projects in China: An Evolutionary Game Model on Complex Networks
by: Zhengqi He, et al.
Published: (2020-01-01) -
A Topology Visualization Early Warning Distribution Algorithm for Large-Scale Network Security Incidents
by: Hui He, et al.
Published: (2013-01-01) -
Study on Evaluation Theory of Bridge Damage State and Methodology on Early Warning of Danger
by: Guofu Jiang, et al.
Published: (2022-01-01) -
The early warning paradox
by: Hugh Logan Ellis, et al.
Published: (2025-02-01) -
A Case Study of Damage Energy Analysis and an Early Warning by Microseismic Monitoring for Large Area Roof Caving in Shallow Depth Seams
by: Like Wei, et al.
Published: (2015-01-01)