Modification of Peck Formula to Predict Ground Surface Settlement of Twin Tunnels in Low Permeability Soil
Accurate prediction of surface settlement induced by tunnel excavation is significant for preventing damage to existing structures under complex geological conditions. The Peck formula is currently considered as an efficient solution for surface settlement prediction. This paper proposes a modified...
Saved in:
Main Authors: | Xiaowu Tang, Jiaxin Liang, Wei Liu, Yuhang Ye, Penglu Gan, Wenfang Zhao, Yue Yu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/6698673 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A New Modified Peck Formula for Predicting the Surface Settlement Based on Stochastic Medium Theory
by: Zhanping Song, et al.
Published: (2019-01-01) -
The Ground Settlement and the Existing Pipeline Response Induced by the Nonsynchronous Construction of a Twin-Tunnel
by: Shicheng Sun, et al.
Published: (2021-01-01) -
Effects of Different Construction Sequences on Ground Surface Settlement and Displacement of Single Long Pile due to Twin Paralleled Shield Tunneling
by: Kan Huang, et al.
Published: (2021-01-01) -
Shallow tunneling's impact on surface settlements
by: Mohamed Djenane, et al.
Published: (2024-05-01) -
Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling
by: Xue Liu, et al.
Published: (2022-01-01)