Research on Grouting Dynamic Monitoring Based on Borehole–Tunnel Joint Resistivity Method

To address the challenge of dynamic monitoring during grouting operations in coal mine fault zones under pressurized mining, this study proposes the Borehole–Tunnel Joint Resistivity Method (BTJRM). By integrating three-dimensional (3D) electrode arrays in both tunnels and boreholes with 3D resistiv...

Full description

Saved in:
Bibliographic Details
Main Authors: Cheng Wang, Lei Zhou, Liangjun Yan, Bofan Li
Format: Article
Language:English
Published: MDPI AG 2025-05-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/15/11/6038
Tags: Add Tag
No Tags, Be the first to tag this record!