Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge Trains

Dispatchers often set noncrossing block sections (NCBSs) for railway out-of-gauge train (OGT) running on double-track railway line for safety reasons. In this paper, we will investigate the best location, length, and number of noncrossing block sections to reduce railway capacity loss due to the ope...

Full description

Saved in:
Bibliographic Details
Main Authors: Yinggui Zhang, Qiong-fang Zeng, Dingyou Lei, Xinyu Wang
Format: Article
Language:English
Published: Wiley 2016-01-01
Series:Discrete Dynamics in Nature and Society
Online Access:http://dx.doi.org/10.1155/2016/2319437
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832549367752425472
author Yinggui Zhang
Qiong-fang Zeng
Dingyou Lei
Xinyu Wang
author_facet Yinggui Zhang
Qiong-fang Zeng
Dingyou Lei
Xinyu Wang
author_sort Yinggui Zhang
collection DOAJ
description Dispatchers often set noncrossing block sections (NCBSs) for railway out-of-gauge train (OGT) running on double-track railway line for safety reasons. In this paper, we will investigate the best location, length, and number of noncrossing block sections to reduce railway capacity loss due to the operation of OGTs. Firstly, yielding, overtaking, stopping, starting, and other operation rules for OGTs running on double-track railway line were designed, and a simulation model based on cellular automata was further put forward. Then, an assessment model for double-track railway line capacity loss due to the operation of OGTs was set up. Some simulation experiments and the comparisons of these results were further given to achieve the optimal setting of NCBS for OGTs running on double-track railway line. In the case of NCBSs number minus one, capacity loss caused by the operation of OGTs can be reduced up to 15.2% in the upstream direction and 6.3% in the downstream direction. Also, the NCBSs should lie at the nearest block sections (BSs) to depot stations and the NCBSs lengths should be as less as possible.
format Article
id doaj-art-3a924806906948a68bec09d56d07cd0f
institution Kabale University
issn 1026-0226
1607-887X
language English
publishDate 2016-01-01
publisher Wiley
record_format Article
series Discrete Dynamics in Nature and Society
spelling doaj-art-3a924806906948a68bec09d56d07cd0f2025-02-03T06:11:22ZengWileyDiscrete Dynamics in Nature and Society1026-02261607-887X2016-01-01201610.1155/2016/23194372319437Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge TrainsYinggui Zhang0Qiong-fang Zeng1Dingyou Lei2Xinyu Wang3School of Traffic and Transportation Engineering, Central South University, Changsha 410075, ChinaSchool of Traffic and Transportation Engineering, Central South University, Changsha 410075, ChinaSchool of Traffic and Transportation Engineering, Central South University, Changsha 410075, ChinaInformation Department, Lanzhou Railway Administration, Lanzhou 730050, ChinaDispatchers often set noncrossing block sections (NCBSs) for railway out-of-gauge train (OGT) running on double-track railway line for safety reasons. In this paper, we will investigate the best location, length, and number of noncrossing block sections to reduce railway capacity loss due to the operation of OGTs. Firstly, yielding, overtaking, stopping, starting, and other operation rules for OGTs running on double-track railway line were designed, and a simulation model based on cellular automata was further put forward. Then, an assessment model for double-track railway line capacity loss due to the operation of OGTs was set up. Some simulation experiments and the comparisons of these results were further given to achieve the optimal setting of NCBS for OGTs running on double-track railway line. In the case of NCBSs number minus one, capacity loss caused by the operation of OGTs can be reduced up to 15.2% in the upstream direction and 6.3% in the downstream direction. Also, the NCBSs should lie at the nearest block sections (BSs) to depot stations and the NCBSs lengths should be as less as possible.http://dx.doi.org/10.1155/2016/2319437
spellingShingle Yinggui Zhang
Qiong-fang Zeng
Dingyou Lei
Xinyu Wang
Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge Trains
Discrete Dynamics in Nature and Society
title Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge Trains
title_full Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge Trains
title_fullStr Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge Trains
title_full_unstemmed Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge Trains
title_short Simulating the Effects of Noncrossing Block Sections Setting Rules on Capacity Loss of Double-Track Railway Line due to the Operation of out-of-Gauge Trains
title_sort simulating the effects of noncrossing block sections setting rules on capacity loss of double track railway line due to the operation of out of gauge trains
url http://dx.doi.org/10.1155/2016/2319437
work_keys_str_mv AT yingguizhang simulatingtheeffectsofnoncrossingblocksectionssettingrulesoncapacitylossofdoubletrackrailwaylineduetotheoperationofoutofgaugetrains
AT qiongfangzeng simulatingtheeffectsofnoncrossingblocksectionssettingrulesoncapacitylossofdoubletrackrailwaylineduetotheoperationofoutofgaugetrains
AT dingyoulei simulatingtheeffectsofnoncrossingblocksectionssettingrulesoncapacitylossofdoubletrackrailwaylineduetotheoperationofoutofgaugetrains
AT xinyuwang simulatingtheeffectsofnoncrossingblocksectionssettingrulesoncapacitylossofdoubletrackrailwaylineduetotheoperationofoutofgaugetrains