Material management comparison between lot for lot and field actual condition

Project material management aims to regulate effective and efficient use materials because material is a resource the largest percentage of the total project cost. In reality, the process of providing materials encounters many obstacles such as late material arrival cause human error and natural dis...

Full description

Saved in:
Bibliographic Details
Main Authors: Atmaja Jajang, Natalia Monika, Masrilayanti, Ramadhani Siraj, Rahmadini Yessa, Sourkan Sulleyman
Format: Article
Language:English
Published: EDP Sciences 2025-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2025/04/e3sconf_icdm2024_06002.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Project material management aims to regulate effective and efficient use materials because material is a resource the largest percentage of the total project cost. In reality, the process of providing materials encounters many obstacles such as late material arrival cause human error and natural disaster, materials not available, overcost, undercost. This research was carried out substructure of the Inpres Market Development Project located in Painan, Pesisir Selatan. Materials for substructure were imported from Padang, which is 70 km from project located. The topographic conditions of areas that prone to disasters such as floods and landslides, which cause connecting road Padang and Painan to be cut off. Arrival materials delay, which results in project delays and wasted costs, so material management is needed. This study aims to obtain the actual material management costs of the field, further compared to the lot for lot technique. The results, total cost field actual condition of Rp8,909,250,238.42, with a lot for lot technique of Rp8,789,667,046. The cost use lot for lot technique is cheaper by Rp119,583,192.42 or 1.34% due, this technique makes the storage cost zero, meaning that every material that comes will be used directly at the project site.