A Performance Forecasting Model for Optimizing CDF-Funded Construction Projects in the Copperbelt Province, Zambia
The Constituency Development Fund (CDF) has become a key mechanism for delivering small-scale urban infrastructure in Zambia. However, persistent challenges such as project delays, cost overruns, and quality deficiencies undermine the effectiveness of these interventions. This study addresses a cri...
Saved in:
| Main Authors: | Peter Kakoma, Penjani Hopkins Nyimbili, Moffat Tembo, Erastus Misheng’u Mwanaumo |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Alanya Üniversitesi
2025-06-01
|
| Series: | Journal of Contemporary Urban Affairs |
| Subjects: | |
| Online Access: | https://ijcua.com/ijcua/article/view/522 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Effect of Cone Area Variations on the Continuous Discharges Flow (CDF) Method Sedimentation Unit as a New Method for Raw Water Turbidity Removal
by: Ridwan Ridwan, et al.
Published: (2023-07-01) -
Mitigating the Effects of Infrastructure Development on the Environment
by: Palma Hussein, et al.
Published: (2024-06-01) -
Bridging Urban Mobility Gaps: Integrating Rapid Transit Railways into Lusaka City’s Transport Network
by: Mwiza Nalomba, et al.
Published: (2025-07-01) -
Public Sector Contracting Model for Management of Construction Tender Price Volatility
by: moffat tembo, et al.
Published: (2023-10-01) -
RAINFALL PREDICTION IN JEMBER REGENCY WITH ADAPTIVE NEURO FUZZY INFERENCE SYSTEM BASED ON GSMaP SATELLITE DATA
by: Abduh Riski, et al.
Published: (2023-09-01)