Preparation and phosphorus removal performance of iron tailings ceramsite

The iron tailings ceramsite was prepared with iron tailings as the main raw material and fly ash as the auxiliary material, and the technological parameters were optimized through the raw material ratio experiment and orthogonal experiment. Based on adsorption isothermal model, thermodynamic paramet...

Full description

Saved in:
Bibliographic Details
Main Authors: YU Xiaode, WANG Daohan
Format: Article
Language:zho
Published: Editorial Office of Industrial Water Treatment 2024-11-01
Series:Gongye shui chuli
Subjects:
Online Access:https://www.iwt.cn/CN/10.19965/j.cnki.iwt.2023-1053
Tags: Add Tag
No Tags, Be the first to tag this record!