Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production
This paper considers the m-machine flow shop scheduling problem with the no-wait constraint to minimize total completion time which is the typical model in steel production. First, the asymptotic optimality of the Shortest Processing Time (SPT) first rule is proven for this problem. To further evalu...
Saved in:
Main Authors: | Huawei Yuan, Yuanwei Jing, Jinping Huang, Tao Ren |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2013-01-01
|
Series: | Journal of Applied Mathematics |
Online Access: | http://dx.doi.org/10.1155/2013/498282 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimal Results and Numerical Simulations for Flow Shop Scheduling Problems
by: Tao Ren, et al.
Published: (2012-01-01) -
Solutions to No-Wait Flow Shop Scheduling Problem Using the Flower Pollination Algorithm Based on the Hormone Modulation Mechanism
by: Chiwen Qu, et al.
Published: (2018-01-01) -
Discrete Bat Algorithm for Optimal Problem of Permutation Flow Shop Scheduling
by: Qifang Luo, et al.
Published: (2014-01-01) -
Optimization of Flow Shop Scheduling in Precast Concrete Component Production via Mixed-Integer Linear Programming
by: Zhansheng Liu, et al.
Published: (2021-01-01) -
A vibration damping optimization algorithm to solve flexible job shop scheduling problems with reverse flows
by: Esmaeil Mehdizadeh, et al.
Published: (2023-12-01)