Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production
This paper considers the m-machine flow shop scheduling problem with the no-wait constraint to minimize total completion time which is the typical model in steel production. First, the asymptotic optimality of the Shortest Processing Time (SPT) first rule is proven for this problem. To further evalu...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2013-01-01
|
Series: | Journal of Applied Mathematics |
Online Access: | http://dx.doi.org/10.1155/2013/498282 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|