Preparation and properties of pea-gravel grouting with sodium bentonite for hydraulic shield tunnel
Abstract Pea-gravel grouting (PGG) is a composite material backfilled between segment and surrounding rock of a shield tunnel, requiring balanced mechanical properties and impermeability. However, the practice always faces an issue of the defects of harden PGG with local cavity, less dense or insuff...
Saved in:
| Main Authors: | Changyong Li, Yabin Yang, Bo Zhou, Kele Wang, Yintao He, Shunbo Zhao |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Nature Portfolio
2025-07-01
|
| Series: | Scientific Reports |
| Subjects: | |
| Online Access: | https://doi.org/10.1038/s41598-025-12061-z |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Loading Response of Segment Lining with Pea-Gravel Grouting Defects for TBM Tunnel in Transition Zones of Surrounding Rocks
by: Qixing Che, et al.
Published: (2025-07-01) -
Rheological Properties and Permeation Grouting Reinforcement Effect of Cement-Bentonite Slurry
by: Yuan Wang, et al.
Published: (2025-02-01) -
Treatment Technology for Grout Eruption during Large Diameter Slurry Shield Tunneling Machine Crossing the Water-Rich Sand Layer at the River Bottom
by: SUN Mingxiang
Published: (2025-05-01) -
Probabilistic Evaluation of Grouting Reinforcement on Settlement Control Effectiveness in Shield Tunneling Construction
by: LAN Mulin, et al.
Published: (2024-12-01) -
Eco-Friendly Shield Muck-Incorporated Grouting Materials: Mix Optimization and Property Evaluation for Silty Clay Tunnel Construction
by: Jinghui Yang, et al.
Published: (2024-10-01)