Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México

We propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers. The current production line presents a high rate of personnel turnover and absenteeism and with an AT value establishe...

Full description

Saved in:
Bibliographic Details
Main Authors: Karen Y. Ferreira García, Jorge de la Riva Rodriguez, Jaime Sánchez Leal, Rosa M. Reyes-Martínez, Arturo Woocay Prieto
Format: Article
Language:English
Published: Wiley 2019-01-01
Series:Journal of Engineering
Online Access:http://dx.doi.org/10.1155/2019/1316734
Tags: Add Tag
No Tags, Be the first to tag this record!