Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México
We propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers. The current production line presents a high rate of personnel turnover and absenteeism and with an AT value establishe...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Journal of Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/1316734 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|