Design, Experiment, and Commissioning of the Spent Fuel Conveying and Loading System of HTR-PM
The Chinese high-temperature gas-cooled reactor pebble-bed module, HTR-PM, began fuel loading in August 2021. The reactor refuels continuously, while the spent fuel is discharged from the core. The spent fuel conveying and loading system was designed to convey the spent fuel pebbles to the spent fue...
Saved in:
Main Authors: | Bin Wu, Jinhua Wang, Yue Li, Haitao Wang, Tao Ma |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Science and Technology of Nuclear Installations |
Online Access: | http://dx.doi.org/10.1155/2022/1817191 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Sensitivity and Uncertainty Analysis of the Maximum Fuel Temperature under Accident Condition of HTR-PM
by: Chen Hao, et al.
Published: (2020-01-01) -
Design of the Online Gross γ Monitoring Instrument at the Exit of the Helium Purification System in HTR-PM
by: Mengqi Lou, et al.
Published: (2018-01-01) -
Criticality safety analysis for eccentric loading of fuel assemblies in spent nuclear fuel cask
by: Seok Geun Cho, et al.
Published: (2025-02-01) -
Numerical Study of the Air Ingress Accident of the HTR-PM and Possible Mitigation Measures
by: Wei Xu, et al.
Published: (2020-01-01) -
Transient Study on the HTR-PM with TINTE-vPower Coupling Code Package
by: Jun Sun, et al.
Published: (2020-01-01)