Robust Proactive Project Scheduling Model for the Stochastic Discrete Time/Cost Trade-Off Problem
We study the project budget version of the stochastic discrete time/cost trade-off problem (SDTCTP-B) from the viewpoint of the robustness in the scheduling. Given the project budget and a set of activity execution modes, each with uncertain activity time and cost, the objective of the SDTCTP-B is t...
Saved in:
Main Authors: | Hongbo Li, Zhe Xu, Li Xiong, Yinbin Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2015-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2015/586087 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Proactive Robust Scheduling Method for Aircraft Carrier Flight Deck Operations with Stochastic Durations
by: Xichao Su, et al.
Published: (2018-01-01) -
Solving the Problem of Time, Cost, and Quality Trade-Off in Project Scheduling under Fuzzy Conditions Using Meta-Heuristic Algorithms
by: Hojjatullah Ghadir, et al.
Published: (2022-01-01) -
Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects
by: Zhe Xu, et al.
Published: (2014-01-01) -
Fuzzy Multicriteria Decision-Making Model for Time-Cost-Risk Trade-Off Optimization in Construction Projects
by: M. Ammar Alzarrad, et al.
Published: (2019-01-01) -
Pricing of Proactive Hedging European Option with Dynamic Discrete Position Strategy
by: Meng Li, et al.
Published: (2019-01-01)