Showing 1 - 20 results of 68 for search 'High-speed rail in China', query time: 0.09s Refine Results
  1. 1
  2. 2
  3. 3

    Earthquake Influence on the Rail Irregularity on High-Speed Railway Bridge by Zhipeng Lai, Xin Kang, Lizhong Jiang, Wangbao Zhou, Yulin Feng, Yuntai Zhang, Jian Yu, Leixin Nie

    Published 2020-01-01
    “…Afterward, the effects of earthquake intensity, soil site, and duration on the rail irregularity of a Chinese typical high-speed railway bridge were investigated. …”
    Get full text
    Article
  4. 4

    Research on expansion joint for high-speed railway long-span bridges in China by Hui Guo, Jinzhou Jiang, Suoting Hu, Chun Yang, Qiqi Xiang, Kou Luo, Xinxin Zhao, Bing Li, Ziquan Yan, Liubin Niu, Jianye Zhao

    Published 2025-02-01
    “…The main aim of this study is to present analysis of recent developments in the research and application of BEJs in high-speed railway (HSR) long-span bridges in China, and to propose a performance-based integral design method for BEJs used with REJs, from both theoretical and engineering perspectives. …”
    Get full text
    Article
  5. 5
  6. 6

    Optimization strategy and solution of 4G high-speed rail network by Zongzhang LI, Zhitong SHI, Yuling WANG, Kun YUAN, Zhiguo WANG, Xinchao ZHANG

    Published 2016-07-01
    “…With the development of LTE data and VoLTE services,subscribers pay more and more attention to network experience.LTE optimization faces many challenges.Therefore,China Mobile Shandong Corporation made a complete and feasibility solution,which met the requirement of high-speed scene optimization.There were four dimensions in this solution: double layers network deployment,VoLTE optimization of high-speed rail,coordinating optimization in the boundary of high-speed network and normal LTE network,and the exploration and deployment of new functions.After the implementation of the solution,VoLTE coverage rate increases from 87.95% to 91.66%,MOS value upgrades from 3.6 to 4,the ratio of MOS value greater than 3.0 rised from 89.61% to 96.70%.…”
    Get full text
    Article
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11

    Stochastic Risk Assessment with a Lagrangian Solution for the Optimal Cost Allocation in High-Speed Rail Networks by Jing Zuo, Jianwu Dang, Min Lyu

    Published 2020-01-01
    “…In large-scale high-speed rail networks (HSRNs), the occurrence of occasional malfunctions or accidents is unavoidable. …”
    Get full text
    Article
  12. 12
  13. 13

    Cluster Coordination between High-speed Rail Transportation Hub Construction and Regional Economy Based on Big Data by Liang Zhao, Yuanhua Jia

    Published 2021-01-01
    “…If driven by big data concepts and methods, the various capabilities of high-speed rail transportation hubs will be sublimated, and the regional economy will be in line with the prosperity of this place. …”
    Get full text
    Article
  14. 14
  15. 15
  16. 16

    The Phenomenology of a Railway Expedition in China: The Gate, the Station, the Journey and the Arrival by Junjie Xi, Paco Mejias Villatoro

    Published 2020-05-01
    “…Two years later, China commenced the development of its high-speed rail (HSR) network and the beginning of the reform era, as part of its statements of a reframed modernity. …”
    Get full text
    Article
  17. 17
  18. 18
  19. 19
  20. 20