Showing 861 - 880 results of 14,380 for search '"novels"', query time: 0.07s Refine Results
  1. 861
  2. 862
  3. 863

    Gut microbiota on anxiety and depression in primary Sjogren's syndrome: A novel insight by Ying Zhu, Kaiyuan Zhang, Ziyue Luo, Yu Song, Xinchang Wang

    Published 2025-02-01
    “…This article reviews recent advancements that explore the mechanism between gut microbiota and emotional disorders in pSS. It aims to provide novel therapies for these emotional disorders in pSS.…”
    Get full text
    Article
  4. 864
  5. 865

    A Novel ZnO-Methylene Blue Nanocomposite Matrix for Biosensing Application by Shibu Saha, S. K. Arya, S. P. Singh, Vinay Gupta

    Published 2011-01-01
    “…A novel hybrid matrix of zinc oxide-methylene blue (ZnO-MB) has been successfully developed for biosensing application. …”
    Get full text
    Article
  6. 866

    Performance of Novel Randomly Oriented High Graphene Carbon in Lithium Ion Capacitors by Rahul S. Kadam, Kishor P. Gadkaree

    Published 2018-01-01
    “…This paper covers details of systematic investigation of the performance of a structurally novel carbon, called Randomly Oriented High Graphene (ROHG) carbon, and graphite in a high rate application device, that is, lithium ion capacitor. …”
    Get full text
    Article
  7. 867
  8. 868

    A Novel Chaotic Rao-2 Algorithm for Optimal Power Flow Solution by Warid Warid

    Published 2022-01-01
    “…This article suggests a novel chaotic Rao-2 algorithm to solve various optimal power flow (OPF) problems. …”
    Get full text
    Article
  9. 869

    Novel Excavation and Construction Method for a Deep Shaft Excavation in Ultrathick Aquifers by Chengyong Cao, Chenghua Shi, Linghui Liu, Jianwen Liu, Mingfeng Lei, Yuexiang Lin, Yichao Ye

    Published 2019-01-01
    “…The shaft excavation with the depth of 41.6 m below the ground surface (BGS) is divided into two major phases, that is, (1) the first part of the excavation (the depth of 23.6 m BGS) is conducted by the way of conventional dewatering and braced excavation (Phase I) and (2) the second excavation with the depth of 23.6 m to 41.6 m BGS is carried out by the novel underwater excavation without drainage technique (Phase II). …”
    Get full text
    Article
  10. 870
  11. 871
  12. 872
  13. 873
  14. 874
  15. 875
  16. 876
  17. 877
  18. 878
  19. 879
  20. 880