-
1
Joint Flood Control Operation of Reservoirs in Xiaoshui Basin Based on DP-PS Algorithm
Published 2024-10-01“…After the optimized operation of Shuangpai Reservoir, the risk rate of flood control in Shuangpai County is below 22% (except for flood No. 7), and the risk rate of flood control in Lingling district is below 34%. In conclusion, after the optimized operation of joint flood control of reservoirs in Xiaoshui Basin, remarkable flood control effects can be seen in Jianghua County, Dao County, Shuangpai County, and Lingling District.…”
Get full text
Article