-
8501
Construction of a 5G Wireless Semantic Web-Assisted English Digital Learning Resource Query System
Published 2021-01-01Get full text
Article -
8502
-
8503
-
8504
-
8505
-
8506
Lifestyles of students of the Nursing School of the National University of Tucumán, Argentina
Published 2023-06-01Get full text
Article -
8507
-
8508
Proyecto de mejoramiento educativo para las Escuelas deFormación Integral
Published 2025-01-01Get full text
Article -
8509
Prevalence of Noncardiac Findings in Patients Undergoing Cardiac Magnetic Resonance Imaging
Published 2012-01-01Get full text
Article -
8510
-
8511
Recurrent Nasal-Type Extranodal Natural Killer/T-Cell Lymphoma with Meningeal Involvement
Published 2021-01-01Get full text
Article -
8512
-
8513
Mapas de produtividade fotovoltaica para o Rio Grande do Sul (Brasil)
Published 2022-09-01Get full text
Article -
8514
Using Machine Learning for Aerostructure Surface Damage Digital Reconstruction
Published 2025-01-01Get full text
Article -
8515
Sıklet sporcularının müsabaka öncesi hızlı kilo vermeye ilişkin metaforik algıları
Published 2023-10-01Get full text
Article -
8516
Food microbiology in the post-COVID-19 era: insights from bibliometric analysis in bioeconomics
Published 2025-01-01Get full text
Article -
8517
Application of One-Dimensional Hydrodynamic Model in Water Storage at the End of Flood Seasons for Changzhou Reservoir
Published 2022-01-01“…Scientific selection of the timing and time for pre-discharge is one of the key techniques and decision bases necessary for conducting reservoir pre-storage at the end of flood seasons.For channel reservoirs,the water level decline in the reservoir area usually lags behind that at the dam sites,which must be fully considered to avoid the submerging loss of the reservoir area and the increase in flood risks for downstream areas due to untimely pre-discharge.In this research,with the mainstream of Xijiang River,Changzhou hydro-junction,as the research object,a one-dimensional hydrodynamic model is built on the basis of the measured data of river sections in the Changzhou reservoir area to study the effects of water storage at the end of flood seasons.The model parameters are calibrated and validated using observed flood data.The results reveal that pre-discharge should be executed for the Changzhou reservoir to the water level of 18.6 m when the inflow forecast within 3 d exceeds 11 800 m<sup>3</sup>/s,and a rising water regime is expected.It takes 2.6 d,3.2 d,and 3.7 d for the pool level to be lowered to 18.6 m from 19.6 m,20.1 m,and 20.6 m,respectively,which is about 1.3~2.3 d earlier than the time needed for the reservoir water level to lower to the corresponding water levels.The study provides a useful technical reference for the optimization of water storage at the end of flood seasons in the Changzhou hydro-junction and also lays a scientific foundation for determining the pre-discharge timing and time of channel reservoirs.…”
Get full text
Article -
8518
Mekanisme Penuntutan Jaksa Penuntut Umum terhadap Tindak Pidana Anak
Published 2017-12-01Get full text
Article -
8519
-
8520
Personal responsibility with health in Cuba: Mapping and play of actors for its promotion
Published 2023-11-01Get full text
Article