Replacement of Cable Stays in Yonghe Bridge in Tianjin, China
Cable replacement is one of the most important approaches for retrofitting an existing cable-stayed bridge. The Yonghe Bridge opened to traffic in 1987 and was the largest concrete cable-stayed bridge in Asia at the time. After nearly 20 years in service, its stay-cable system was completely replace...
Saved in:
Main Author: | Hongjiang Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/6650393 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Seismic Passive Control of Cable-Stayed Bridges
by: Hosam-Eddin M. Ali, et al.
Published: (1995-01-01) -
Research on Fluid Viscous Damper Parameters of Cable-Stayed Bridge in Northwest China
by: Xiongjun He, et al.
Published: (2017-01-01) -
Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge
by: X. X. Cheng, et al.
Published: (2020-01-01) -
Vortex-Induced Vibration of a Cable-Stayed Bridge
by: M. T. Song, et al.
Published: (2016-01-01) -
Cable Force Measurement of Cable-Stayed Bridge Based on Microwave Radar Test Technology
by: Gongjian Che, et al.
Published: (2024-01-01)