Verification of Testing Methods for Fully Automated Operation Systems Based on Rail Transit Simulation Testing Platform
[Objective] In light of the current lack of systematic and scientific evaluation methods for the completeness of subsystem design schemes, and the compatibility/adaptability among subsystems in rail transit FAO (fully automated operation) systems, it is urgently necessary to establish a rail transit...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-06-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20230525.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|