Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China
In this study, the reasonable construction sequence of an overlapping tunnel shield is investigated. Taking the overlapping tunnel of Tianjin Metro Line 5 as the background, a three-dimensional numerical model was established using Flac3D software to study the influence of the “first up and then dow...
Saved in:
Main Authors: | Zhiyong Yang, Yaowen Ding, Yusheng Jiang, Kuanda Fang, Linwei Dong, Weiqiang Qi, Zheng Wei |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/4909750 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on Internal Force of Tunnel Segment by Considering the Influence of Joints
by: Linwei Dong, et al.
Published: (2020-01-01) -
Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv
by: Weiqiang Qi, et al.
Published: (2020-01-01) -
Shaking Table Tests for Seismic Response of Oblique Overlapped Tunnel
by: Hao Lei, et al.
Published: (2021-01-01) -
Deformation and Reinforcement of the Existing Tunnel Affected by New Shield Tunnel Construction with Small Clearance
by: Junchao Zhang, et al.
Published: (2025-01-01) -
Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction
by: Yong Xu, et al.
Published: (2022-01-01)