Operation and Economic Analysis for Ring Road: Baqubah City as Case Study

Many cities in Diyala governorate are suffering from traffic congestion due to high percentage of through traffic. One of the most applicable solutions to such problem is the construction of ring road by which the through traffic is avoided. In this research, Baqubah city is subjected to economic an...

Full description

Saved in:
Bibliographic Details
Main Authors: Raquim Nihad Zehawi, Ali Hussein Hameed, Yassir Nashaat A Kareem
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Journal of Engineering
Online Access:http://dx.doi.org/10.1155/2022/8145754
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832559457344684032
author Raquim Nihad Zehawi
Ali Hussein Hameed
Yassir Nashaat A Kareem
author_facet Raquim Nihad Zehawi
Ali Hussein Hameed
Yassir Nashaat A Kareem
author_sort Raquim Nihad Zehawi
collection DOAJ
description Many cities in Diyala governorate are suffering from traffic congestion due to high percentage of through traffic. One of the most applicable solutions to such problem is the construction of ring road by which the through traffic is avoided. In this research, Baqubah city is subjected to economic analyses in order to determine whether the establishment of a peripheral ring road to downgrade the traffic congestion in the city center would be economically feasible. The planned road is divided into three segments linking the three major entries to the city. The first segment is already existing, while the second and third segments are following a predetermined orbital route that has not been utilized yet. Hence, the first segment is not considered in the economic analyses, which included the second and third. The traffic data was collected for all entries, and then the fractions of traffic that expected to utilize the new ring road were estimated and projected for the design lifetime of the road taken as 20 years after two years of design and construction. The suggested road was proved profitable by the use of two economic parameters: the first is the benefit cost ratio, which returned the values of 7.44 and 5.92, for the second and third segments, respectively. The net present value calculations revealed the values of $50,399,966 and $43,991,883 for the second and third segments, respectively.
format Article
id doaj-art-ef9d85667e504fb1a60f289bff5428a5
institution Kabale University
issn 2314-4912
language English
publishDate 2022-01-01
publisher Wiley
record_format Article
series Journal of Engineering
spelling doaj-art-ef9d85667e504fb1a60f289bff5428a52025-02-03T01:30:02ZengWileyJournal of Engineering2314-49122022-01-01202210.1155/2022/8145754Operation and Economic Analysis for Ring Road: Baqubah City as Case StudyRaquim Nihad Zehawi0Ali Hussein Hameed1Yassir Nashaat A Kareem2Highway and Airport Engineering DepartmentHighway and Airport Engineering DepartmentHighway and Airport Engineering DepartmentMany cities in Diyala governorate are suffering from traffic congestion due to high percentage of through traffic. One of the most applicable solutions to such problem is the construction of ring road by which the through traffic is avoided. In this research, Baqubah city is subjected to economic analyses in order to determine whether the establishment of a peripheral ring road to downgrade the traffic congestion in the city center would be economically feasible. The planned road is divided into three segments linking the three major entries to the city. The first segment is already existing, while the second and third segments are following a predetermined orbital route that has not been utilized yet. Hence, the first segment is not considered in the economic analyses, which included the second and third. The traffic data was collected for all entries, and then the fractions of traffic that expected to utilize the new ring road were estimated and projected for the design lifetime of the road taken as 20 years after two years of design and construction. The suggested road was proved profitable by the use of two economic parameters: the first is the benefit cost ratio, which returned the values of 7.44 and 5.92, for the second and third segments, respectively. The net present value calculations revealed the values of $50,399,966 and $43,991,883 for the second and third segments, respectively.http://dx.doi.org/10.1155/2022/8145754
spellingShingle Raquim Nihad Zehawi
Ali Hussein Hameed
Yassir Nashaat A Kareem
Operation and Economic Analysis for Ring Road: Baqubah City as Case Study
Journal of Engineering
title Operation and Economic Analysis for Ring Road: Baqubah City as Case Study
title_full Operation and Economic Analysis for Ring Road: Baqubah City as Case Study
title_fullStr Operation and Economic Analysis for Ring Road: Baqubah City as Case Study
title_full_unstemmed Operation and Economic Analysis for Ring Road: Baqubah City as Case Study
title_short Operation and Economic Analysis for Ring Road: Baqubah City as Case Study
title_sort operation and economic analysis for ring road baqubah city as case study
url http://dx.doi.org/10.1155/2022/8145754
work_keys_str_mv AT raquimnihadzehawi operationandeconomicanalysisforringroadbaqubahcityascasestudy
AT alihusseinhameed operationandeconomicanalysisforringroadbaqubahcityascasestudy
AT yassirnashaatakareem operationandeconomicanalysisforringroadbaqubahcityascasestudy