Systematic Performance Evaluation of Shield TBM Cutters for Excavating Multiple Soft Rock
Cutter performance evaluation is important for shield TBM during the design and refurbishment stage. To face the challenges of choosing the proper cutters for tunneling in complex condition, according to the concept of parameter profile analysis, a systematic evaluation method was proposed. In this...
Saved in:
Main Authors: | Chuyuan Cao, Kui Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/4026283 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Experimental Study on the Evolution of Argillization of Mudstone and Cutter Wear during the TBM Tunnelling
by: Kanglei Song, et al.
Published: (2021-01-01) -
Multiobjective Optimization Design for Structural Parameters of TBM Disc Cutter Rings Based on FAHP and SAMPGA
by: Laikuang Lin, et al.
Published: (2019-01-01) -
Transient dynamic analysis of cutter-head loads: effects of different cutter spacings during excavation
by: Minglei Kang, et al.
Published: (2025-01-01) -
Multiple Disturbances of Existing Tunnels Caused by Deep Excavation and New Shield Tunnel
by: Haoran Li, et al.
Published: (2023-01-01) -
Measured Analysis on Surface Deformation and Influence of Cutter Torque for Twin Shield Tunnelling in Silty Sand
by: Yuqing Dong, et al.
Published: (2022-01-01)