A Three-Stage Birandom Program for Unit Commitment with Wind Power Uncertainty
The integration of large-scale wind power adds a significant uncertainty to power system planning and operating. The wind forecast error is decreased with the forecast horizon, particularly when it is from one day to several hours ahead. Integrating intraday unit commitment (UC) adjustment process b...
Saved in:
Main Authors: | Na Zhang, Weidong Li, Rao Liu, Quan Lv, Liang Sun |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2014-01-01
|
Series: | The Scientific World Journal |
Online Access: | http://dx.doi.org/10.1155/2014/583157 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An Equilibrium Chance-Constrained Multiobjective Programming Model with Birandom Parameters and Its Application to Inventory Problem
by: Zhimiao Tao, et al.
Published: (2013-01-01) -
A Birandom Job Search Problem with Risk Tolerance
by: Guoli Wang, et al.
Published: (2012-01-01) -
Optimization of Aerodynamic Power of Three Wind Turbines in Turbulent Wind Farm
by: Kang CHEN, et al.
Published: (2025-01-01) -
Frequency Nadir Constrained Unit Commitment for High Renewable Penetration Island Power Systems
by: Xuebo Liu, et al.
Published: (2024-01-01) -
Probabilistic Optimal Active and Reactive Power Dispatch including Load and Wind Uncertainties considering Correlation
by: Mahmmadsufiyan Shaik, et al.
Published: (2023-01-01)