A Method and Engineering Practice for a Fully Mechanized Caving Coalface to Rapidly Pass Through a Large Fault
One of the technical problems that must be solved in coal mine production is when the coalface rapidly crosses the fault. Based on the occurrence characteristics of the F<sub>6</sub> fault (maximum throw: 13.5 m) in the #3<sub>up</sub>1101 fully mechanized caving coalface at...
Saved in:
| Main Authors: | Wei Zhang, Feili Yang, Jingyu Chang, Shengxun Zhao, Bin Xu, Jinyong Xiang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-01-01
|
| Series: | Applied Sciences |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2076-3417/15/2/731 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on Surrounding Rock Control Technology of Gob‐Gob Roadway Driven by Fully Mechanized Caving With Large Mining Height and Small Coal Pillar in Extra Thick Coal Seam
by: Linjun Peng, et al.
Published: (2025-06-01) -
Research and Application of the Synergistic Support System of “LDAGF” in an Extremely Soft and Fragile Fully Mechanized Caving Face Roadway
by: Xianjie Ni, et al.
Published: (2024-09-01) -
Boundary Spatial Morphology of Top-Coal Limit Equilibrium Zone in Fully Mechanized Top-Coal Caving Stope in Steeply Dipping Coal Seam
by: Ding Lang, et al.
Published: (2025-06-01) -
Application of active advanced support technology in fully mechanized top-coal caving face with large mining height at Madiliang Coal Mine
by: KAN Lei
Published: (2025-06-01) -
Grouting failure mechanism and new pre-grouting reinforcement technology of narrow coal pillar in fully-mechanized caving gob-side entry
by: Dongdong Chen, et al.
Published: (2025-06-01)