A Method and Engineering Practice for a Fully Mechanized Caving Coalface to Rapidly Pass Through a Large Fault
One of the technical problems that must be solved in coal mine production is when the coalface rapidly crosses the fault. Based on the occurrence characteristics of the F<sub>6</sub> fault (maximum throw: 13.5 m) in the #3<sub>up</sub>1101 fully mechanized caving coalface at...
Saved in:
Main Authors: | Wei Zhang, Feili Yang, Jingyu Chang, Shengxun Zhao, Bin Xu, Jinyong Xiang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2025-01-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/15/2/731 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A New Asymmetric Fully Homomorphic Encryption Scheme for Cloud Banking Data
by: Zana Thalage Omar, et al.
Published: (2021-01-01) -
Evolution characteristics of overburden structure in inclined fully mechanized caving under residual coal pillars of the upper layer
by: LIU Yong, et al.
Published: (2024-12-01) -
Investigation of parameters affecting throwing velocity and accuracy in handball
by: Neslihan Akçay, et al.
Published: (2023-10-01) -
Caves /
by: Banting, Erinn
Published: (2007) -
EXPLORING THE HIDDEN DEPTHS: IDENTIFYING AND MAPPING CAVES IN SOUTH MALANG'S KARST AREA FOR SPECIAL INTEREST TOURIST ATTRACTIONS
by: Mohammad Ainul LABIB, et al.
Published: (2024-10-01)