Numerical simulation method for double shield TBMs crossing weak zones
Abstract Deformation and collapse of the surrounding rock, leading to machine jamming, are critical factors hindering the safe and efficient operation of Double Shield Tunnel Boring Machines (DS TBMs). Machine jamming can be categorized into shield jamming and cutterhead jamming, each influenced by...
Saved in:
| Main Authors: | Zhiwen Wang, Meng Wei, Yang Liu, Yushi Liu, Xinyu Tan, Xin Tong |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Nature Portfolio
2025-02-01
|
| Series: | Scientific Reports |
| Subjects: | |
| Online Access: | https://doi.org/10.1038/s41598-025-86051-6 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Prediction of Settlement Due to Shield TBM Tunneling Based on Three-Dimensional Numerical Analysis
by: Ji-Seok Yun, et al.
Published: (2025-06-01) -
The Simulation of Grouting Behavior in the Pea Gravel Filling Layer Behind a Double-Shield TBM Based on the Level Set Method
by: Xinlong Li, et al.
Published: (2025-07-01) -
Determining a Suitable Reinforcement Strategy for TBM Advance in a Gully Fault Zone Without Jamming—A Numerical Analysis
by: Yuanzhuo Li, et al.
Published: (2025-02-01) -
Assessment for shallow and large tunnel construction in weak ground conditions: Application of tunnel boring machines
by: Servet Karahan, et al.
Published: (2025-03-01) -
Unstuck Technology for EPB/TBM Dual Mode Shield Machine Stuck in Rock Stratum
by: DUAN Yueqiang
Published: (2025-01-01)