Introduction of the Design of Rolled Concrete Dam for Yungxishui Hydroelectrifcal Station on the First Stage
Saved in:
| Main Authors: | 李永平, 董运涛 |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2001-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47674092&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Introduction of Roller Compacted Concrete Dam Engineering Measures in Huizhou Pumped Storage Power Station
by: LEI Zhen
Published: (2009-01-01) -
Design of Concrete-face Rock-fill Dam in Deze Hydropower Station
by: YANG Jian-xue, et al.
Published: (2009-01-01) -
Rolled Concrete Dam Bedding Surface Property Comprehensive Evaluation
by: CHEN Long, et al.
Published: (2007-01-01) -
Design and Quality Control of Mix Proportion of Concrete for the Dam of Pinghu Hydropower Station
by: 杨林
Published: (2004-01-01) -
Quality Control of Roller Compacted Concrete Engineering in Dam of Guangzhao Hydroelectricity Station in Beipanjiang River of Guizhou
by: CHEN Guang-ping
Published: (2009-01-01)