Study on Sensitivity Parameters Analysis of Grouting Reinforcement Underpassing Existing Subway Tunnel by Numerical Modeling

When carrying out construction that underpasses existing subway tunnels, the surrounding rock is frequently disturbed. Therefore, it can loosen easily and become unstable, which makes its stability difficult to control. Here, we considered an existing subway tunnel in a certain subway section and us...

Full description

Saved in:
Bibliographic Details
Main Authors: Zaiqiang Hu, Bin Ma, Xingzhou Chen, Lili Chen
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/8868216
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832559730830082048
author Zaiqiang Hu
Bin Ma
Xingzhou Chen
Lili Chen
author_facet Zaiqiang Hu
Bin Ma
Xingzhou Chen
Lili Chen
author_sort Zaiqiang Hu
collection DOAJ
description When carrying out construction that underpasses existing subway tunnels, the surrounding rock is frequently disturbed. Therefore, it can loosen easily and become unstable, which makes its stability difficult to control. Here, we considered an existing subway tunnel in a certain subway section and used orthogonal experiments to design a simulation program as well as the UDEC (Universal Distinct Element Code) simulation software to determine the influences of four factors (i.e., grout density, grouting pressure, dynamic shear force, and viscosity) on the grouting reinforcement effect. The following results were obtained: (1) the combination of the construction method and the grouting parameters strongly influences the reinforcement effect on the surrounding rock of the tunnel. The grouting pressure is not directly proportional to the stability of the surrounding rock. The dynamic adjustment of the relationship between the grouting pressure and the grout density can effectively improve the stress state of the surrounding rock of the tunnel, control surface settlement and deformation, and reduce the section reduction rate of the tunnel. (2) The distribution of joints is closely related to the failure area and form of the surrounding rock of the tunnel. For surrounding rock with well-developed joint fissures, an excessively high grouting pressure should not be used as they are unstable. (3) The effective bearing range of grouting-reinforced surrounding rock is dependent on the pore pressure and principal stress difference. The area where the pore pressure is 70–80% of the initial grouting pressure is the effective bearing range of the grouting-reinforced surrounding rock. The stability of the surrounding rock increases with decreasing principal stress difference and increasing range. (4) The actual monitored data show that the surface settlement can be effectively reduced by handling of grouting reinforcement parameters flexibly, which can meet the control standards.
format Article
id doaj-art-e825300466e54b619ef5bcffd6151038
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-e825300466e54b619ef5bcffd61510382025-02-03T01:29:23ZengWileyAdvances in Civil Engineering1687-80861687-80942021-01-01202110.1155/2021/88682168868216Study on Sensitivity Parameters Analysis of Grouting Reinforcement Underpassing Existing Subway Tunnel by Numerical ModelingZaiqiang Hu0Bin Ma1Xingzhou Chen2Lili Chen3School of Civil Engineering and Architecture, Xi’an University of Technology, Xi’an, ChinaSchool of Civil Engineering and Architecture, Xi’an University of Technology, Xi’an, ChinaSchool of Architecture Civil and Engineering, Xi’an University of Science and Technology, Xi’an, ChinaSchool of Architecture Civil and Engineering, Xi’an University of Science and Technology, Xi’an, ChinaWhen carrying out construction that underpasses existing subway tunnels, the surrounding rock is frequently disturbed. Therefore, it can loosen easily and become unstable, which makes its stability difficult to control. Here, we considered an existing subway tunnel in a certain subway section and used orthogonal experiments to design a simulation program as well as the UDEC (Universal Distinct Element Code) simulation software to determine the influences of four factors (i.e., grout density, grouting pressure, dynamic shear force, and viscosity) on the grouting reinforcement effect. The following results were obtained: (1) the combination of the construction method and the grouting parameters strongly influences the reinforcement effect on the surrounding rock of the tunnel. The grouting pressure is not directly proportional to the stability of the surrounding rock. The dynamic adjustment of the relationship between the grouting pressure and the grout density can effectively improve the stress state of the surrounding rock of the tunnel, control surface settlement and deformation, and reduce the section reduction rate of the tunnel. (2) The distribution of joints is closely related to the failure area and form of the surrounding rock of the tunnel. For surrounding rock with well-developed joint fissures, an excessively high grouting pressure should not be used as they are unstable. (3) The effective bearing range of grouting-reinforced surrounding rock is dependent on the pore pressure and principal stress difference. The area where the pore pressure is 70–80% of the initial grouting pressure is the effective bearing range of the grouting-reinforced surrounding rock. The stability of the surrounding rock increases with decreasing principal stress difference and increasing range. (4) The actual monitored data show that the surface settlement can be effectively reduced by handling of grouting reinforcement parameters flexibly, which can meet the control standards.http://dx.doi.org/10.1155/2021/8868216
spellingShingle Zaiqiang Hu
Bin Ma
Xingzhou Chen
Lili Chen
Study on Sensitivity Parameters Analysis of Grouting Reinforcement Underpassing Existing Subway Tunnel by Numerical Modeling
Advances in Civil Engineering
title Study on Sensitivity Parameters Analysis of Grouting Reinforcement Underpassing Existing Subway Tunnel by Numerical Modeling
title_full Study on Sensitivity Parameters Analysis of Grouting Reinforcement Underpassing Existing Subway Tunnel by Numerical Modeling
title_fullStr Study on Sensitivity Parameters Analysis of Grouting Reinforcement Underpassing Existing Subway Tunnel by Numerical Modeling
title_full_unstemmed Study on Sensitivity Parameters Analysis of Grouting Reinforcement Underpassing Existing Subway Tunnel by Numerical Modeling
title_short Study on Sensitivity Parameters Analysis of Grouting Reinforcement Underpassing Existing Subway Tunnel by Numerical Modeling
title_sort study on sensitivity parameters analysis of grouting reinforcement underpassing existing subway tunnel by numerical modeling
url http://dx.doi.org/10.1155/2021/8868216
work_keys_str_mv AT zaiqianghu studyonsensitivityparametersanalysisofgroutingreinforcementunderpassingexistingsubwaytunnelbynumericalmodeling
AT binma studyonsensitivityparametersanalysisofgroutingreinforcementunderpassingexistingsubwaytunnelbynumericalmodeling
AT xingzhouchen studyonsensitivityparametersanalysisofgroutingreinforcementunderpassingexistingsubwaytunnelbynumericalmodeling
AT lilichen studyonsensitivityparametersanalysisofgroutingreinforcementunderpassingexistingsubwaytunnelbynumericalmodeling