Usulan Penerapan Total Productive Maintenance pada Mesin Turbin Gas

Overall Equipment Effectiveness (OEE) is one of the tools to enhance the effectiveness of the utilization rate of machinery and equipment in Total Productive Maintenance (TPM). TPM is a principle of management to improve productivity and efficiency of the production company to use the machine effec...

Full description

Saved in:
Bibliographic Details
Main Author: Irnanda Pratiwi
Format: Article
Language:English
Published: Universitas Andalas 2019-05-01
Series:Jurnal Optimasi Sistem Industri
Subjects:
Online Access:https://josi.ft.unand.ac.id/index.php/josi/article/view/181
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850031943798751232
author Irnanda Pratiwi
author_facet Irnanda Pratiwi
author_sort Irnanda Pratiwi
collection DOAJ
description Overall Equipment Effectiveness (OEE) is one of the tools to enhance the effectiveness of the utilization rate of machinery and equipment in Total Productive Maintenance (TPM). TPM is a principle of management to improve productivity and efficiency of the production company to use the machine effectively. This study measures the value of OEE on gas turbine engine Centaur 50 C3344 which held on operation and maintenance section in PT Perta Samtan Gas Kilang Ekstraksi NGL Prabumulih in the period, followed by analyzing the value of using Pareto analysis of the results obtained by the root causes of the OEE. The conclusion that the value of the analysis results obtained on average exceeded the standard value of OEE 85.63% from 85%, even though in one period the value of OEE less than standard (22.63%). Factors that may experience rapid drop predicted loss is breakdown losses 382 hours (46.53%) and idling minor stoppages  373 hours (45.43), reduce speed 48 hours or 5.85%, rework losses  13 hours or 1.58%, and set up and adjustment losses  5 hours or 0.61%.  As a result of which may not have an impact in a short time, but will immediately attack the machine if there is no treatment of maintenance as continuously and directly.
format Article
id doaj-art-e7192e7b4d4a4a439dfd1587ca679ee1
institution DOAJ
issn 2088-4842
2442-8795
language English
publishDate 2019-05-01
publisher Universitas Andalas
record_format Article
series Jurnal Optimasi Sistem Industri
spelling doaj-art-e7192e7b4d4a4a439dfd1587ca679ee12025-08-20T02:58:50ZengUniversitas AndalasJurnal Optimasi Sistem Industri2088-48422442-87952019-05-0118110.25077/josi.v18.n1.p37-47.2019Usulan Penerapan Total Productive Maintenance pada Mesin Turbin GasIrnanda Pratiwi0Universitas Tridinanti Overall Equipment Effectiveness (OEE) is one of the tools to enhance the effectiveness of the utilization rate of machinery and equipment in Total Productive Maintenance (TPM). TPM is a principle of management to improve productivity and efficiency of the production company to use the machine effectively. This study measures the value of OEE on gas turbine engine Centaur 50 C3344 which held on operation and maintenance section in PT Perta Samtan Gas Kilang Ekstraksi NGL Prabumulih in the period, followed by analyzing the value of using Pareto analysis of the results obtained by the root causes of the OEE. The conclusion that the value of the analysis results obtained on average exceeded the standard value of OEE 85.63% from 85%, even though in one period the value of OEE less than standard (22.63%). Factors that may experience rapid drop predicted loss is breakdown losses 382 hours (46.53%) and idling minor stoppages  373 hours (45.43), reduce speed 48 hours or 5.85%, rework losses  13 hours or 1.58%, and set up and adjustment losses  5 hours or 0.61%.  As a result of which may not have an impact in a short time, but will immediately attack the machine if there is no treatment of maintenance as continuously and directly. https://josi.ft.unand.ac.id/index.php/josi/article/view/181EngineMaintenanceOEETPMTurbine
spellingShingle Irnanda Pratiwi
Usulan Penerapan Total Productive Maintenance pada Mesin Turbin Gas
Jurnal Optimasi Sistem Industri
Engine
Maintenance
OEE
TPM
Turbine
title Usulan Penerapan Total Productive Maintenance pada Mesin Turbin Gas
title_full Usulan Penerapan Total Productive Maintenance pada Mesin Turbin Gas
title_fullStr Usulan Penerapan Total Productive Maintenance pada Mesin Turbin Gas
title_full_unstemmed Usulan Penerapan Total Productive Maintenance pada Mesin Turbin Gas
title_short Usulan Penerapan Total Productive Maintenance pada Mesin Turbin Gas
title_sort usulan penerapan total productive maintenance pada mesin turbin gas
topic Engine
Maintenance
OEE
TPM
Turbine
url https://josi.ft.unand.ac.id/index.php/josi/article/view/181
work_keys_str_mv AT irnandapratiwi usulanpenerapantotalproductivemaintenancepadamesinturbingas