Enhanced Construction Project Duration Estimation Using Artificial Neural Networks: Initial Design and Planning Stages
Maintaining efficiency and quality control during the early phases of construction projects depends on accurate duration estimation. However, because there is not enough data available in the initial stages of project planning, traditional methodologies suffer. To address these challenges, this stu...
Saved in:
| Main Authors: | Heba Al-Attar, Ghaleb Sweis, Bashar Tarawneh, Waleed Abu-Khader, Leen Haddad, Rateb Sweis |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
UTS ePRESS
2025-07-01
|
| Series: | Construction Economics and Building |
| Subjects: | |
| Online Access: | https://epress.lib.uts.edu.au/journals/index.php/AJCEB/article/view/9253 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
THE IMPACT OF PREPARATION OF INITIAL PERMISSIVE DOCUMENTATION ON THE DURATION FOR REALIZATION OF INVESTMENT-CONSTRUCTION PROJECTS
Published: (2016-12-01) -
Study on the optimization of duration for repetitive projects considering spatial interference effects in operations
by: Chunli Zhang, et al.
Published: (2025-04-01) -
Efficient Rollout Algorithms for Resource-Constrained Project Scheduling with a Flexible Project Structure and Uncertain Activity Durations
by: Chunlai Yu, et al.
Published: (2025-04-01) -
A Shorter Duration of the Indian Summer Monsoon in Constrained Projections
by: Yifeng Cheng, et al.
Published: (2025-01-01) -
The role of constructions in understanding predictability measures and their correspondence to word duration
by: Bybee Joan, et al.
Published: (2024-08-01)