A Discussion of Reinforcement Timing Optimization for Main Inclined Shaft Roadway with Water Seepage

The infiltration and physical and chemical effects of fissure water often have a degrading effect on the strength and bearing capacity of the surrounding rock of the roadway. With the increase of the time of water infiltration, the roadway deformation increases exponentially, resulting in a higher r...

Full description

Saved in:
Bibliographic Details
Main Authors: Minglei Zhang, Chaoyu Chang, Wen Cao
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2020/8850911
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832547744446676992
author Minglei Zhang
Chaoyu Chang
Wen Cao
author_facet Minglei Zhang
Chaoyu Chang
Wen Cao
author_sort Minglei Zhang
collection DOAJ
description The infiltration and physical and chemical effects of fissure water often have a degrading effect on the strength and bearing capacity of the surrounding rock of the roadway. With the increase of the time of water infiltration, the roadway deformation increases exponentially, resulting in a higher risk of roadway destruction. In this paper, targeting at the supporting and protection issues associated with the main inclined shaft during the water-drenching, a numerical simulation method was established to evaluate the impact of the fissure water on the deformation of the surrounding rock of the roadway, and a solution to control the top water in main inclined shafts by grouting was proposed. Through the numerical simulation method, the effective penetration range of the slurry in the surrounding rock and the variation of the tunnel deformation with the grouting timing were studied. A method of combining numerical simulation with on-site monitoring to determine a reasonable grouting timing was proposed. The field application suggests that grouting at a reasonable timing can effectively control the influence of seepage water from the roof crack of the main inclined shaft on the deformation of the roadway surrounding rock, improve the integrity of the roadway surrounding rock, increase the bearing capacity of the support, and maintain the safety and stability of the roadway surrounding rock of the main inclined shaft. Furthermore, this study can provide insightful references to the grouting reinforcement adopted by similar main inclined shafts.
format Article
id doaj-art-e544d6b3d85443acb97be4058ecdb362
institution Kabale University
issn 1468-8115
1468-8123
language English
publishDate 2020-01-01
publisher Wiley
record_format Article
series Geofluids
spelling doaj-art-e544d6b3d85443acb97be4058ecdb3622025-02-03T06:43:37ZengWileyGeofluids1468-81151468-81232020-01-01202010.1155/2020/88509118850911A Discussion of Reinforcement Timing Optimization for Main Inclined Shaft Roadway with Water SeepageMinglei Zhang0Chaoyu Chang1Wen Cao2Institute of Disaster Prevention, Langfang 065201, ChinaInstitute of Disaster Prevention, Langfang 065201, ChinaInstitute of Disaster Prevention, Langfang 065201, ChinaThe infiltration and physical and chemical effects of fissure water often have a degrading effect on the strength and bearing capacity of the surrounding rock of the roadway. With the increase of the time of water infiltration, the roadway deformation increases exponentially, resulting in a higher risk of roadway destruction. In this paper, targeting at the supporting and protection issues associated with the main inclined shaft during the water-drenching, a numerical simulation method was established to evaluate the impact of the fissure water on the deformation of the surrounding rock of the roadway, and a solution to control the top water in main inclined shafts by grouting was proposed. Through the numerical simulation method, the effective penetration range of the slurry in the surrounding rock and the variation of the tunnel deformation with the grouting timing were studied. A method of combining numerical simulation with on-site monitoring to determine a reasonable grouting timing was proposed. The field application suggests that grouting at a reasonable timing can effectively control the influence of seepage water from the roof crack of the main inclined shaft on the deformation of the roadway surrounding rock, improve the integrity of the roadway surrounding rock, increase the bearing capacity of the support, and maintain the safety and stability of the roadway surrounding rock of the main inclined shaft. Furthermore, this study can provide insightful references to the grouting reinforcement adopted by similar main inclined shafts.http://dx.doi.org/10.1155/2020/8850911
spellingShingle Minglei Zhang
Chaoyu Chang
Wen Cao
A Discussion of Reinforcement Timing Optimization for Main Inclined Shaft Roadway with Water Seepage
Geofluids
title A Discussion of Reinforcement Timing Optimization for Main Inclined Shaft Roadway with Water Seepage
title_full A Discussion of Reinforcement Timing Optimization for Main Inclined Shaft Roadway with Water Seepage
title_fullStr A Discussion of Reinforcement Timing Optimization for Main Inclined Shaft Roadway with Water Seepage
title_full_unstemmed A Discussion of Reinforcement Timing Optimization for Main Inclined Shaft Roadway with Water Seepage
title_short A Discussion of Reinforcement Timing Optimization for Main Inclined Shaft Roadway with Water Seepage
title_sort discussion of reinforcement timing optimization for main inclined shaft roadway with water seepage
url http://dx.doi.org/10.1155/2020/8850911
work_keys_str_mv AT mingleizhang adiscussionofreinforcementtimingoptimizationformaininclinedshaftroadwaywithwaterseepage
AT chaoyuchang adiscussionofreinforcementtimingoptimizationformaininclinedshaftroadwaywithwaterseepage
AT wencao adiscussionofreinforcementtimingoptimizationformaininclinedshaftroadwaywithwaterseepage
AT mingleizhang discussionofreinforcementtimingoptimizationformaininclinedshaftroadwaywithwaterseepage
AT chaoyuchang discussionofreinforcementtimingoptimizationformaininclinedshaftroadwaywithwaterseepage
AT wencao discussionofreinforcementtimingoptimizationformaininclinedshaftroadwaywithwaterseepage