Study on Surrounding Rock Stability Mechanism of Gob-Side Entry Retaining with Prefabricated Fracture
To study the optimal layout of prefabricated roof cutting line in gob-side entry retaining with roof cutting and pressure relief, based on the engineering geological conditions of 5249 working face in Beipingdong Coal Mine of Baoyuan Mining Company, the FLAC3D numerical simulation method was used to...
Saved in:
Main Authors: | Hao Wu, Chuanqu Zhu, Qingfeng Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/5819672 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research on Control Mechanism of Surrounding Rock of Deep Gob-Side Entry Retaining
by: Jianxiong Liu, et al.
Published: (2021-01-01) -
Application of Presplitting Blasting Technology in Surrounding Rock Control of Gob-Side Entry Retaining with Hard Roof: A Case Study
by: Shuang Gong, et al.
Published: (2021-01-01) -
Short Cantilever Rock Beam Structure and Mechanism of Gob-Side Entry Retaining Roof in Reuse Period
by: Jingke Wu, et al.
Published: (2020-01-01) -
The Stability of Gob-Side Entry Retaining in a High-Gas-Risk Mine
by: Junwen Zhang, et al.
Published: (2019-01-01) -
Study on Stability Control of Retained Gob-Side Entry by Blasting Fracturing Roof Technology in Thick Immediate Roof
by: Jingang Guo, et al.
Published: (2021-01-01)