Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates

This paper deals with constrained multistage machines flow-shop (FS) scheduling model in which processing times, job weights, and break-down machine time are characterized by fuzzy numbers that are piecewise as well as quadratic in nature. Avoiding to convert the model into its crisp, the closed int...

Full description

Saved in:
Bibliographic Details
Main Authors: Hamiden Abd El-Wahed Khalifa, Sultan S. Alodhaibi, Pavan Kumar
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Fuzzy Systems
Online Access:http://dx.doi.org/10.1155/2021/6697060
Tags: Add Tag
No Tags, Be the first to tag this record!