Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates
This paper deals with constrained multistage machines flow-shop (FS) scheduling model in which processing times, job weights, and break-down machine time are characterized by fuzzy numbers that are piecewise as well as quadratic in nature. Avoiding to convert the model into its crisp, the closed int...
Saved in:
Main Authors: | Hamiden Abd El-Wahed Khalifa, Sultan S. Alodhaibi, Pavan Kumar |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Fuzzy Systems |
Online Access: | http://dx.doi.org/10.1155/2021/6697060 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Developing a new fuzzy approach for solving two-machine flow shop scheduling problems under fuzziness
by: Hamiden Khalifa
Published: (2023-12-01) -
An Interactive Approach for Solving the Multiobjective Minimum Cost Flow Problem in the Fuzzy Environment
by: Majed G. Alharbi, et al.
Published: (2020-01-01) -
On Stackelberg Leader with Min-Max Followers to Solve Fuzzy Continuous Static Games
by: Hamiden Abd El Wahed Khalifa, et al.
Published: (2022-01-01) -
Modified artificial fish swarm algorithm to solve unrelated parallel machine scheduling problem under fuzzy environment
by: Azhar Mahdi Ibadi, et al.
Published: (2024-12-01) -
Toward characterizing solutions to complex programming problems involving fuzzy parameters in constraints
by: Hamiden Khalifa, et al.
Published: (2024-03-01)