Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates
This paper deals with constrained multistage machines flow-shop (FS) scheduling model in which processing times, job weights, and break-down machine time are characterized by fuzzy numbers that are piecewise as well as quadratic in nature. Avoiding to convert the model into its crisp, the closed int...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Fuzzy Systems |
Online Access: | http://dx.doi.org/10.1155/2021/6697060 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832547814295470080 |
---|---|
author | Hamiden Abd El-Wahed Khalifa Sultan S. Alodhaibi Pavan Kumar |
author_facet | Hamiden Abd El-Wahed Khalifa Sultan S. Alodhaibi Pavan Kumar |
author_sort | Hamiden Abd El-Wahed Khalifa |
collection | DOAJ |
description | This paper deals with constrained multistage machines flow-shop (FS) scheduling model in which processing times, job weights, and break-down machine time are characterized by fuzzy numbers that are piecewise as well as quadratic in nature. Avoiding to convert the model into its crisp, the closed interval approximation for the piecewise quadratic fuzzy numbers is incorporated. The suggested method leads a noncrossing optimal sequence to the considered problem and minimizes the total elapsed time under fuzziness. The proposed approach helps the decision maker to search for applicable solution related to real-world problems and minimizes the total fuzzy elapsed time. A numerical example is provided for the illustration of the suggested methodology. |
format | Article |
id | doaj-art-e2f5dde6be674a0d9769b5a20a5cb019 |
institution | Kabale University |
issn | 1687-7101 1687-711X |
language | English |
publishDate | 2021-01-01 |
publisher | Wiley |
record_format | Article |
series | Advances in Fuzzy Systems |
spelling | doaj-art-e2f5dde6be674a0d9769b5a20a5cb0192025-02-03T06:43:28ZengWileyAdvances in Fuzzy Systems1687-71011687-711X2021-01-01202110.1155/2021/66970606697060Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due DatesHamiden Abd El-Wahed Khalifa0Sultan S. Alodhaibi1Pavan Kumar2Operations Research Department, Faculty of Graduate Studies for Statistical Research, Cairo University, Giza, EgyptMathematics Department, College of Science and Arts, AL-Rass, Qassim University, Buraydah, Saudi ArabiaMathematics Division, School of Advanced Science and Languages, VIT Bhopal University, Sehore-466114, MP, IndiaThis paper deals with constrained multistage machines flow-shop (FS) scheduling model in which processing times, job weights, and break-down machine time are characterized by fuzzy numbers that are piecewise as well as quadratic in nature. Avoiding to convert the model into its crisp, the closed interval approximation for the piecewise quadratic fuzzy numbers is incorporated. The suggested method leads a noncrossing optimal sequence to the considered problem and minimizes the total elapsed time under fuzziness. The proposed approach helps the decision maker to search for applicable solution related to real-world problems and minimizes the total fuzzy elapsed time. A numerical example is provided for the illustration of the suggested methodology.http://dx.doi.org/10.1155/2021/6697060 |
spellingShingle | Hamiden Abd El-Wahed Khalifa Sultan S. Alodhaibi Pavan Kumar Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates Advances in Fuzzy Systems |
title | Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates |
title_full | Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates |
title_fullStr | Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates |
title_full_unstemmed | Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates |
title_short | Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates |
title_sort | solving constrained flow shop scheduling problem through multistage fuzzy binding approach with fuzzy due dates |
url | http://dx.doi.org/10.1155/2021/6697060 |
work_keys_str_mv | AT hamidenabdelwahedkhalifa solvingconstrainedflowshopschedulingproblemthroughmultistagefuzzybindingapproachwithfuzzyduedates AT sultansalodhaibi solvingconstrainedflowshopschedulingproblemthroughmultistagefuzzybindingapproachwithfuzzyduedates AT pavankumar solvingconstrainedflowshopschedulingproblemthroughmultistagefuzzybindingapproachwithfuzzyduedates |