Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates
This paper deals with constrained multistage machines flow-shop (FS) scheduling model in which processing times, job weights, and break-down machine time are characterized by fuzzy numbers that are piecewise as well as quadratic in nature. Avoiding to convert the model into its crisp, the closed int...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Fuzzy Systems |
Online Access: | http://dx.doi.org/10.1155/2021/6697060 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This paper deals with constrained multistage machines flow-shop (FS) scheduling model in which processing times, job weights, and break-down machine time are characterized by fuzzy numbers that are piecewise as well as quadratic in nature. Avoiding to convert the model into its crisp, the closed interval approximation for the piecewise quadratic fuzzy numbers is incorporated. The suggested method leads a noncrossing optimal sequence to the considered problem and minimizes the total elapsed time under fuzziness. The proposed approach helps the decision maker to search for applicable solution related to real-world problems and minimizes the total fuzzy elapsed time. A numerical example is provided for the illustration of the suggested methodology. |
---|---|
ISSN: | 1687-7101 1687-711X |