Application of Assembled Steel Bridge in Spillway Traffic Bridge:A Case Study of Jiupo Reservoir in Huizhou City
Saved in:
| Main Authors: | GUO Linlin, YANG Meng, ZHONG Zhiyun |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2023-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.S2.011 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Modeling Experimental Study of Spillway in Reinforcement of Baojiang Reservoir in Nanxiong City
by: HE Zhen-jun, et al.
Published: (2009-01-01) -
Impact of Traffic Load Randomness on Fatigue of Steel Bridges
by: Adam Wysokowski
Published: (2020-12-01) -
Treatment of Concrete Cracking for Spillway of a Reservoir
by: 何永日
Published: (2004-01-01) -
Diagenesis of Deep Low Permeability Reservoir in Huizhou Sag and Its Influence on Reservoirs
by: Shan Jiang, et al.
Published: (2024-12-01) -
A Certain Reservoir Spillway Crest Gate Pier Reinforcement Work
by: YANG Yu-jun, et al.
Published: (2007-01-01)