Study on Deformation Law of Subway Construction under Passing Existing Line in Short Distance

With the large-scale development and utilization of underground space projects, the subway-led Rail Transit Project is developing vigorously, and the safety and stability of subway under passing existing projects have become a key issue for the future. In this paper, the deformation law of subway tu...

Full description

Saved in:
Bibliographic Details
Main Authors: Cong-Shuang Luo, Yi-Hong Cheng, Zhe Bai, Tong Shen, Xu-Yang Wu, Qing-Guo Wang
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6626927
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832558965820489728
author Cong-Shuang Luo
Yi-Hong Cheng
Zhe Bai
Tong Shen
Xu-Yang Wu
Qing-Guo Wang
author_facet Cong-Shuang Luo
Yi-Hong Cheng
Zhe Bai
Tong Shen
Xu-Yang Wu
Qing-Guo Wang
author_sort Cong-Shuang Luo
collection DOAJ
description With the large-scale development and utilization of underground space projects, the subway-led Rail Transit Project is developing vigorously, and the safety and stability of subway under passing existing projects have become a key issue for the future. In this paper, the deformation law of subway tunnel under the existing track is studied by using the method of ROCSCIENCE software and field measurement, which is based on the construction of a new double-tunnel shield-driven subway tunnel under the existing city of pile rapid track project. In the crossing area, the distance between the top of the tunnel and the pile foundation is 6.2 m and the distance between the tunnel and the existing track surface is 19.6 m. It is required that the settlement of track caused by the new tunnel construction should not exceed 2 mm. The results show that the settlement of the existing track is greatly influenced by the new tunnel without reinforcement and grouting, and the maximum settlement is more than 9.92 mm. The settlement of the existing track can be controlled to 1.93 mm by adjusting the construction parameters of the shield machine and grouting reinforcement at different stages during construction.
format Article
id doaj-art-dbe7c93e21514f9c92daaf137c66ed47
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-dbe7c93e21514f9c92daaf137c66ed472025-02-03T01:31:13ZengWileyAdvances in Civil Engineering1687-80861687-80942021-01-01202110.1155/2021/66269276626927Study on Deformation Law of Subway Construction under Passing Existing Line in Short DistanceCong-Shuang Luo0Yi-Hong Cheng1Zhe Bai2Tong Shen3Xu-Yang Wu4Qing-Guo Wang5Henan University of Urban Construction, Pingdingshan 467036, ChinaHenan University of Urban Construction, Pingdingshan 467036, ChinaHenan University of Urban Construction, Pingdingshan 467036, ChinaHenan University of Urban Construction, Pingdingshan 467036, ChinaHenan University of Urban Construction, Pingdingshan 467036, ChinaHenan University of Urban Construction, Pingdingshan 467036, ChinaWith the large-scale development and utilization of underground space projects, the subway-led Rail Transit Project is developing vigorously, and the safety and stability of subway under passing existing projects have become a key issue for the future. In this paper, the deformation law of subway tunnel under the existing track is studied by using the method of ROCSCIENCE software and field measurement, which is based on the construction of a new double-tunnel shield-driven subway tunnel under the existing city of pile rapid track project. In the crossing area, the distance between the top of the tunnel and the pile foundation is 6.2 m and the distance between the tunnel and the existing track surface is 19.6 m. It is required that the settlement of track caused by the new tunnel construction should not exceed 2 mm. The results show that the settlement of the existing track is greatly influenced by the new tunnel without reinforcement and grouting, and the maximum settlement is more than 9.92 mm. The settlement of the existing track can be controlled to 1.93 mm by adjusting the construction parameters of the shield machine and grouting reinforcement at different stages during construction.http://dx.doi.org/10.1155/2021/6626927
spellingShingle Cong-Shuang Luo
Yi-Hong Cheng
Zhe Bai
Tong Shen
Xu-Yang Wu
Qing-Guo Wang
Study on Deformation Law of Subway Construction under Passing Existing Line in Short Distance
Advances in Civil Engineering
title Study on Deformation Law of Subway Construction under Passing Existing Line in Short Distance
title_full Study on Deformation Law of Subway Construction under Passing Existing Line in Short Distance
title_fullStr Study on Deformation Law of Subway Construction under Passing Existing Line in Short Distance
title_full_unstemmed Study on Deformation Law of Subway Construction under Passing Existing Line in Short Distance
title_short Study on Deformation Law of Subway Construction under Passing Existing Line in Short Distance
title_sort study on deformation law of subway construction under passing existing line in short distance
url http://dx.doi.org/10.1155/2021/6626927
work_keys_str_mv AT congshuangluo studyondeformationlawofsubwayconstructionunderpassingexistinglineinshortdistance
AT yihongcheng studyondeformationlawofsubwayconstructionunderpassingexistinglineinshortdistance
AT zhebai studyondeformationlawofsubwayconstructionunderpassingexistinglineinshortdistance
AT tongshen studyondeformationlawofsubwayconstructionunderpassingexistinglineinshortdistance
AT xuyangwu studyondeformationlawofsubwayconstructionunderpassingexistinglineinshortdistance
AT qingguowang studyondeformationlawofsubwayconstructionunderpassingexistinglineinshortdistance