Control method for smoothnessin segmental assembly construction of super-long span bridges for high-speed railways
Abstract The construction deviations of super-long span bridges in high-speed railways during the construction phase directly affect the track smoothness after bridge completion, thereby impacting the operational quality of high-speed trains. This study analyzes the main influencing factors of smoot...
Saved in:
| Main Authors: | Can Huang, Chengming Peng, Zhaofu Yan, Yuan Zhang, Yifan Deng |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
SpringerOpen
2025-08-01
|
| Series: | Advances in Bridge Engineering |
| Subjects: | |
| Online Access: | https://doi.org/10.1186/s43251-025-00176-2 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Dynamic Adaptability of Spherical Bearings in Small-Span Bridges for Heavy-Haul Railways
by: Shuli Chen, et al.
Published: (2025-02-01) -
Pendekatan Theory Super Life Span
by: Lely Agustini Nasution, et al.
Published: (2021-07-01) -
Dynamic response of high-speed railway vehicle and welded turnout on large-span bridges based on rigid-flexible coupling system
by: Xiaopei Cai, et al.
Published: (2024-12-01) -
Nonlinear seismic response analysis of long-span railway cable-stayed bridges crossing strike-slip faults
by: Jin Zhang, et al.
Published: (2024-10-01) -
Conceptualization and performance evaluation of a super long span cable-stayed bridge with CFRP cables and CFRP–UHPC composite girders
by: Xingyu Tan, et al.
Published: (2025-07-01)