Determining the Layout Parameters of the Gas Drainage Roadway: A Study for Sima Coalmine China

To determine the layout parameters of the gas drainage roadway (GDR) serving for the working face, an analytical calculation method of fracture zone and the modelling experiment were adopted, and the overburden fissure induced by mining and the height of fracture zone were analyzed. For the research...

Full description

Saved in:
Bibliographic Details
Main Authors: Zhiliu Wang, Bo Liu, Yanhui Han, Zhaoyang Li, Yingjie Cao, Fuzhou Qi
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/3007807
Tags: Add Tag
No Tags, Be the first to tag this record!