Optimization of Asynchronous Electric Generator Parameters in System Wind Power Installations
The paper considers a wind power installation with asynchronous electric generator which is integrated in large power system. Mathematical model describing a wind motor, an asynchronous generator, step-up transformers, cable and open-air electric power lines has been used to obtain linear polynomial...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2004-12-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/1182 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The paper considers a wind power installation with asynchronous electric generator which is integrated in large power system. Mathematical model describing a wind motor, an asynchronous generator, step-up transformers, cable and open-air electric power lines has been used to obtain linear polynomials. These polynomials make it possible to investigate the influence of asynchronous generator parameters and average wind velocity on quasi-stationary operational conditions of a system wind power installation. Methodology on selection of optimum active resistance quantity for a short-circuited winding of an asynchronous generator rotor in a system wind power installation has been elaborated |
---|---|
ISSN: | 1029-7448 2414-0341 |