Uncertainty Reduction of Metering System in Kharg Island Oil Terminal by Adjusting Pipe Line Volume Flow rate
Saved in:
| Format: | Article |
|---|---|
| Language: | English |
| Published: |
Iranian Association of Chemical Engineering (IAChE)
2011-07-01
|
| Series: | Iranian Journal of Chemical Engineering |
| Online Access: | https://www.ijche.com/article_10285_51251dbc97d1d76bdb1a9828e444f3eb.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of the Monte Carlo Simulation to Improve the Calibration Uncertainty of Volume Meters for Hydrocarbons Custody Transfer
by: Agustín García-Berrocal, et al.
Published: (2024-12-01) -
Optimization Design and Simulation of Adjusting Mechanism for Wall-press Oil and Gas In-pipe Robot
by: Yang Caixia, et al.
Published: (2018-01-01) -
Techniques for Natural Gas Physical Properties Definition for Flow Rate and Volume Metering Systems
by: Fedir Matiko, et al.
Published: (2016-12-01) -
Evaluation Uncertainty in the Volume of Oil in Place in Mishrif Reservoir
by: Loay Khamees, et al.
Published: (2024-12-01) -
On Uncertainty and Uncertainty Reduction
by: Ugo Corte
Published: (2025-01-01)