Slurry and Technology Optimization for Grouting Fissures in Earthen Sites with Quicklime
Shrinkage differentiation and the need for multiple replenishments of slurry after fissure reinforcement are key problems for the grouting reinforcement of fissures in earthen sites. In this study, quicklime was mixed with 1.5% SH binder, clay, and fly ash in different proportions to prepare nine di...
Saved in:
Main Authors: | Kai Cui, Fei Feng, Wen-wu Chen, Dong-hua Wang, Xiao-hai Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Advances in Materials Science and Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/9076760 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Identification of Modal Parameters for Reinforcement of Walls in Earthen Ruins
by: Bei Liu, et al.
Published: (2021-01-01) -
Forming digital kinships with earthen materials. The T-Stool
by: Rhett Russo
Published: (2021-12-01) -
Experimental Study of Slurry Flow in Mining-Induced Fractures during Longwall Overburden Grout Injection
by: Dayang Xuan, et al.
Published: (2020-01-01) -
Grouting Mechanism of Cement-Based Slurry in a Concentric Annulus under High Groundwater Pressure
by: Weijie Zhang, et al.
Published: (2019-01-01) -
Study on the Calculation Method of the Diffusion Range of Grouting Slurry for a High-speed Railway Ballastless Track Subgrade
by: Changwei Yang, et al.
Published: (2021-01-01)