Pricing, crashing and coordination for prefabricated construction supply chain with the lead-time incentive: a power perspective
Abstract The perceived benefits of prefabrication may be offset by its low acceptance and uptake. This is exacerbated by uncertainties faced by manufacturers in which short lead-times result in both high crashing costs combined with demand opportunity loss to time-sensitive consumers. This study int...
Saved in:
| Main Authors: | Wen Jiang, Ting Huang, Kanfeng Shi, Igor Martek |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Springer Nature
2025-03-01
|
| Series: | Humanities & Social Sciences Communications |
| Online Access: | https://doi.org/10.1057/s41599-025-04534-3 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Modelling of pricing, crashing, and coordination strategies of prefabricated construction supply Chain with power structure.
by: Wen Jiang, et al.
Published: (2023-01-01) -
Dynamic Incentive Mechanism of Collaboration in Prefabricated Building Supply Chain Based on Differential Game
by: Junwu Wang, et al.
Published: (2024-10-01) -
Exploring Critical Factors Influencing the Resilience of the Prefabricated Construction Supply Chain
by: Tianyang Liu, et al.
Published: (2025-01-01) -
Study on Mechanism of Factors Affecting Resilience of Prefabricated Building Supply Chain
by: Chi Zhang, et al.
Published: (2023-01-01) -
Coordinating a Supply Chain with Price and Advertisement Dependent Stochastic Demand
by: Liying Li, et al.
Published: (2013-01-01)