Emergency Planning Zones Estimation for Karachi-2 and Karachi-3 Nuclear Power Plants using Gaussian Puff Model

Emergency planning zones (PAZ and UPZ) around the Karachi-2 and Karachi-3 nuclear power plants (K-2/K-3 NPPs) have been realistically determined by employing Gaussian puff model and Gaussian plume model together for atmospheric transport, diffusion, and deposition of radioactive material using onsit...

Full description

Saved in:
Bibliographic Details
Main Authors: Sümer Şahin, Muhammad Ali
Format: Article
Language:English
Published: Wiley 2016-01-01
Series:Science and Technology of Nuclear Installations
Online Access:http://dx.doi.org/10.1155/2016/8549498
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832567197758652416
author Sümer Şahin
Muhammad Ali
author_facet Sümer Şahin
Muhammad Ali
author_sort Sümer Şahin
collection DOAJ
description Emergency planning zones (PAZ and UPZ) around the Karachi-2 and Karachi-3 nuclear power plants (K-2/K-3 NPPs) have been realistically determined by employing Gaussian puff model and Gaussian plume model together for atmospheric transport, diffusion, and deposition of radioactive material using onsite and regional data related to meteorology, topography, and land-use along with latest IAEA Post-Fukushima Guidelines. The analysis work has been carried out using U.S.NRC computer code RASCAL 4.2. The assumed environmental radioactive releases provide the sound theoretical and practical bases for the estimation of emergency planning zones covering most expected scenario of severe accident and most recent multiunit Fukushima Accident. Sheltering could be used as protective action for longer period of about 04 days. The area about 3 km of K-2/K-3 NPPs site should be evacuated and an iodine thyroid blocking agent should be taken before release up to about 14 km to prevent severe deterministic effects. Stochastic effects may be avoided or minimized by evacuating the area within about 8 km of the K-2/K-3 NPPs site. Protective actions may become more effective and cost beneficial by using current methodology as Gaussian puff model realistically represents atmospheric transport, dispersion, and disposition processes in contrast to straight-line Gaussian plume model explicitly in study area. The estimated PAZ and UPZ were found 3 km and 8 km, respectively, around K-2/K-3 NPPs which are in well agreement with IAEA Post-Fukushima Study. Therefore, current study results could be used in the establishment of emergency planning zones around K-2/K-3 NPPs.
format Article
id doaj-art-d056877165624c12b49923a64c657cd9
institution Kabale University
issn 1687-6075
1687-6083
language English
publishDate 2016-01-01
publisher Wiley
record_format Article
series Science and Technology of Nuclear Installations
spelling doaj-art-d056877165624c12b49923a64c657cd92025-02-03T01:02:10ZengWileyScience and Technology of Nuclear Installations1687-60751687-60832016-01-01201610.1155/2016/85494988549498Emergency Planning Zones Estimation for Karachi-2 and Karachi-3 Nuclear Power Plants using Gaussian Puff ModelSümer Şahin0Muhammad Ali1Near East University, Faculty of Engineering, Turkish Republic of Northern Cyprus, Yakın Doğu Bulvarı, PK:99138 Lefkoşa/KKTC, Mersin 10, TurkeyATILIM University, Faculty of Engineering, Department of Mechanical Engineering, 06836 İncek, Gölbaşı, Ankara, TurkeyEmergency planning zones (PAZ and UPZ) around the Karachi-2 and Karachi-3 nuclear power plants (K-2/K-3 NPPs) have been realistically determined by employing Gaussian puff model and Gaussian plume model together for atmospheric transport, diffusion, and deposition of radioactive material using onsite and regional data related to meteorology, topography, and land-use along with latest IAEA Post-Fukushima Guidelines. The analysis work has been carried out using U.S.NRC computer code RASCAL 4.2. The assumed environmental radioactive releases provide the sound theoretical and practical bases for the estimation of emergency planning zones covering most expected scenario of severe accident and most recent multiunit Fukushima Accident. Sheltering could be used as protective action for longer period of about 04 days. The area about 3 km of K-2/K-3 NPPs site should be evacuated and an iodine thyroid blocking agent should be taken before release up to about 14 km to prevent severe deterministic effects. Stochastic effects may be avoided or minimized by evacuating the area within about 8 km of the K-2/K-3 NPPs site. Protective actions may become more effective and cost beneficial by using current methodology as Gaussian puff model realistically represents atmospheric transport, dispersion, and disposition processes in contrast to straight-line Gaussian plume model explicitly in study area. The estimated PAZ and UPZ were found 3 km and 8 km, respectively, around K-2/K-3 NPPs which are in well agreement with IAEA Post-Fukushima Study. Therefore, current study results could be used in the establishment of emergency planning zones around K-2/K-3 NPPs.http://dx.doi.org/10.1155/2016/8549498
spellingShingle Sümer Şahin
Muhammad Ali
Emergency Planning Zones Estimation for Karachi-2 and Karachi-3 Nuclear Power Plants using Gaussian Puff Model
Science and Technology of Nuclear Installations
title Emergency Planning Zones Estimation for Karachi-2 and Karachi-3 Nuclear Power Plants using Gaussian Puff Model
title_full Emergency Planning Zones Estimation for Karachi-2 and Karachi-3 Nuclear Power Plants using Gaussian Puff Model
title_fullStr Emergency Planning Zones Estimation for Karachi-2 and Karachi-3 Nuclear Power Plants using Gaussian Puff Model
title_full_unstemmed Emergency Planning Zones Estimation for Karachi-2 and Karachi-3 Nuclear Power Plants using Gaussian Puff Model
title_short Emergency Planning Zones Estimation for Karachi-2 and Karachi-3 Nuclear Power Plants using Gaussian Puff Model
title_sort emergency planning zones estimation for karachi 2 and karachi 3 nuclear power plants using gaussian puff model
url http://dx.doi.org/10.1155/2016/8549498
work_keys_str_mv AT sumersahin emergencyplanningzonesestimationforkarachi2andkarachi3nuclearpowerplantsusinggaussianpuffmodel
AT muhammadali emergencyplanningzonesestimationforkarachi2andkarachi3nuclearpowerplantsusinggaussianpuffmodel