Causes of Delay in the Construction Projects of Subway Tunnel
The constructions of urban infrastructure are an important sector that provides remarkable ingredients for the economic development of modern cities. However, a large number of transportation infrastructure construction projects are delayed; therefore, those projects always exceed their original tim...
Saved in:
| Main Authors: | Dingbang Zhang, Hang Zhang, Tao Cheng |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2020-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2020/8883683 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Evaluation of greenhouse gas emissions in subway tunnel construction
by: Yalin Guo, et al.
Published: (2025-06-01) -
Pasternak Model-Based Tunnel Segment Uplift Model of Subway Shield Tunnel during Construction
by: Xiang-Ling Tao, et al.
Published: (2021-01-01) -
A Method for Map Construction in Degraded Environments of Subway Tunnels
by: CHEN Zhiwei, et al.
Published: (2023-08-01) -
Strata Response Analysis of Subway Tunnel Construction Under Hidden Karst Caves in the Tunnel Arch
by: HUANG Song
Published: (2024-12-01) -
RETRACTED: Reduction of additional pressure from ground construction on the subway escalator tunnel
by: Sokornov A.A., et al.
Published: (2024-01-01)